We anticipate that the WP1, WP2 and WP3 can be executed in two 4 weeks PSI beam blocks scheduled in
|
|
2013 and 2014. The first experiment would be used to commission the full set-up and shake down its
|
|
components. The priority would be to perform most of the proton measurements, while simultaneously
|
|
measuring the X-rays for WP2. A first neutron measurement is also anticipated. This part of the experiment
|
|
is ready in spring 2013, and we would prefer an early running time during the 2013 schedule. After that,
|
|
the data would be analyzed and results reported at the BVR 2014. Depending on the outcome, in the run
|
|
2014, additional statistics data taking and systematic studies are foreseen to achieve publication quality
|
|
data. In addition, the large NaI would be installed for WP2 measurements.
|
|
|
|
\vspace{5mm}
|
|
|