Initialize a repository for writeup
This commit is contained in:
50
AlCapPSI/BeamRequirements.tex
Normal file
50
AlCapPSI/BeamRequirements.tex
Normal file
@@ -0,0 +1,50 @@
|
||||
|
||||
\subsubsection*{ Experimental area}
|
||||
$\pi$E1 beam line
|
||||
|
||||
\subsubsection*{Required beam properties}
|
||||
\begin{itemize}
|
||||
\item Particle: $\mu^-$
|
||||
\item Momentum: 30--35 MeV/c
|
||||
\item Momentum bin: $<2$ \% FWHM
|
||||
\item Beam spot: $<2$ cm in diameter
|
||||
\item Intensity: $2 \times 10^{4}$ s$^{-1}$
|
||||
\item Beam purity: $<10$ \% electrons
|
||||
\end{itemize}
|
||||
|
||||
\subsubsection*{ Duration of the experiment}
|
||||
|
||||
{\bf We request two 4 week PSI beam blocks, one scheduled in 2013 and the
|
||||
next one in 2014.}
|
||||
|
||||
The first experiment would be used to commission the full set-up and shake down its
|
||||
components for the three work-packages (WPs) planned. The priority would be to perform most of the proton
|
||||
measurements (WP1), while simultaneously measuring the X-rays for
|
||||
WP2. A first exploratory neutron measurement
|
||||
to start WP3 is also anticipated. This part of the experiment is ready
|
||||
in spring 2013, and we would prefer an
|
||||
early running time during the 2013 schedule. After that,
|
||||
the data would be analyzed and results reported at the BVR 2014. Depending on the outcome,
|
||||
in 2014 additional proton statistics data taking and systematic studies are foreseen to achieve publication quality
|
||||
data. But the main focus in 2014 will be on final neutron
|
||||
measurements and operating the large NaI for the WP2 program.
|
||||
|
||||
The requested 2013 beam time will be structured in the following way:
|
||||
\begin{itemize}
|
||||
\item Week 1: Set-up. Commission beam counters, proton, X-ray and
|
||||
neutron detectors. Vacuum in target chamber.
|
||||
|
||||
\item Week 2: Beam-optimization. Thick, then thin Si detectors
|
||||
as active targets are used to study beam properties and optimize the
|
||||
stopping fraction, to quantify background and select the
|
||||
optimal geometry of the detector packages, relative to
|
||||
target and beam. The X-ray detector will assist in the tuning process. First high statistics data set is taken
|
||||
with thin Si in the target position, to calibrate the target
|
||||
response function and normalize the X-ray detectors.
|
||||
|
||||
\item Week 3: High statistics measurements with 3 targets of
|
||||
Al and Ti, 25-200 $\mu$m thickness.
|
||||
|
||||
\item Week 4: Continued Al, Ti measurements. Last days
|
||||
dedicated neutron measurement, thick target, with proton vacuum chamber removed.
|
||||
\end{itemize}
|
||||
Reference in New Issue
Block a user