update cv, stm report
This commit is contained in:
@@ -223,7 +223,7 @@ The uncertainty on the hit rate estimation is \SI{2.6}{\percent} if
|
||||
only statistical uncertainty of the hit counting in \cref{eqn:stm_hit_count} is
|
||||
taken into account. This hit rate is too high for a HPGe detector to function
|
||||
well, so an attenuator would be installed upstream of the spot-size collimator
|
||||
to lower the hit rate to about \SI{10}{\kHz}.
|
||||
to lower the hit rate to about \SI{50}{\kHz}.
|
||||
|
||||
\subsection{Hit timing on STM detectors}
|
||||
\label{sub:timing_of_hits_on_stm_detectors}
|
||||
|
||||
Reference in New Issue
Block a user