@@ -223,7 +223,7 @@ The uncertainty on the hit rate estimation is \SI{2.6}{\percent} if
only statistical uncertainty of the hit counting in \cref{eqn:stm_hit_count} is
taken into account. This hit rate is too high for a HPGe detector to function
well, so an attenuator would be installed upstream of the spot-size collimator
to lower the hit rate to about \SI{10}{\kHz}.
to lower the hit rate to about \SI{50}{\kHz}.
\subsection{Hit timing on STM detectors}
\label{sub:timing_of_hits_on_stm_detectors}